top of page

Northern Beaches Council engaged RCG to carry out upgrades to multiple buildings of the lakeside caravan park. A complete refurbishment was carried out to the existing amenities block including detailed carpentry by our internal carpentry team. The existing camp kitchens also received an upgrade with new floor tile finishes and paint. Structural repairs and carpentry was undertaken on the ensuite buildings and the existing office was completely stripped out with a reconfiguration to the layout. Existing campsites undertook excavation and preparation for new artificial turf to be installed.

bottom of page